Information of the project
This project involved various technical operations and installations under the BMDA (Barind Multipurpose Development Authority) initiative in Rangpur. The work included setup, testing, and performance monitoring of high-efficiency solar and electrical systems.
-
Installation and configuration of solar panels and inverters.
-
Performance testing to ensure maximum system efficiency (up to 97.75%).
-
Use of black anodized aluminum frames for durability and corrosion resistance.
-
System designed to operate under extreme temperatures (-45°F to +185°F).
-
Long-term reliability ensured with a 25-year warranty.
-
Focused on sustainable, renewable energy implementation.
Technical description
